  • Important milestone
    JUN YE
    Location : Home >> About us >> Important milestone

    Important milestone

    2024

    *The new factory enters the construction cycle
    *The core equipment of a German chemical giant has been successfully delivered
    2023*The output value has reached a historical peak
    *Entering the carbon capture and recycling industry chain
    2022*Smooth delivery of core large-scale equipment in multiple chemical plants
    *The annual production of heat exchangers accounts for one-third of the total equipment
    2020*Junye South Factory has been put into use, with a production capacity of 3000 tons and a land area of 34000 square meters

    2019

    * Invested in the construction of Jiangsu Junye South Factory, covering an area of 34,000 square meters, the first phase of construction area of about 13,000 square meters, has been put into use
    * Long-term lease of the bridge production workshop in Linjiang Base (Jiangdu Port), about 2 km away from Jiangdu Port, and has obtained ASME U and U2 qualifications, with the ability to manufacture equipment with a maximum diameter of 9 meters, unlimited length and lifting 280 tons

    2018

    * Entering the field of new energy, 220 resin columns were completed on time and on quality

    2017

    * Completed the manufacture of 15 low speed rotations
    * Completed the design and manufacture, on-site installation and commissioning of sludge drying skid equipment and carbon black dry granulator
    * Completed the design and manufacture of European standard EN13445 products

    2016

    * Construction of stainless steel workshop; Strengthen the customer's trust in our stainless steel equipment manufacturing

    2015

    * The tube and tube plate only expansion without welding process, successfully completed the successful delivery of multiple super duplex steel heat exchangers
    * Our company designed and manufactured two vacuum rake dryers (20m³) with the largest unit production in China, and completed the installation and commissioning work on site

    2014

    * Lean production management achieved initial results: the production cycle of low-speed rotary equipment was reduced by 15%; The per capita production capacity increased by 8.9% * The implementation of pipeline operation mode for large equipment, 40 large-scale desalination filter projects with 200,000 cubic meters/day of processing capacity were completed in advance and with high quality, and were recognized by customers

    2013

    * Completed the design and manufacture of high-cleaning purification equipment and double-sided composite heat exchanger equipment * undertook the turnkey project of low-speed rotary unit equipment, including design, manufacture and driving

    2012

    * Start lean production management
    * Completed the design and manufacture of high clean heat exchanger and tower equipment, oil sand separation equipment, PED standard equipment

    2011

    * Through market and product structure adjustments, we overcame the impact of the financial crisis on our operations in 2011, and both output value and sales reached a record high since the establishment of the company
    * Sales of low-speed rotary equipment accounted for 42%, of which three processing technologies have obtained national patents, and the processing level has been recognized by a number of famous foreign enterprises
    * Tried to implement the assembly line method for batch products, and achieved good results in the progress, quality and cost of 121 heat exchangers

    2010

    * Andritz awarded "Quality Supplier for Cost Improvement and Manufacturing Excellence 2010"
    * Completed the manufacture of FFD and GF, producing a total of 12 low-speed rotary equipment
    * Large sleeping cars put into use
    * Complete thermodynamic calculation and manufacture of titanium heat exchangers

    2009

    * Design and manufacture of the core equipment of the pulping industry -- large boiler * Design and manufacture of 200,000 cubic meters/day of fresh water large filter * Design and manufacture of titanium equipment * Construction of large equipment paint spraying production line * seawater desalination, environment, pulping and other industries accounted for more than 50% of sales; Large equipment sales accounted for more than 80%

    2008

    * Large processing equipment put into operation (5M machining diameter high-speed CNC drill, 50MM plate rolling machine, 4M vertical lathe, 14M edge milling machine, 60MM thick X-ray machine, etc.)
    * Establishment and trial operation of large-scale equipment production base; Large equipment began to export abroad (overall delivery of maximum diameter up to 9M, maximum length up to 50M)
    * Obtain SQL A1 and A2 certificates
    *HC material used in heat exchanger equipment, heat exchanger sealing surface after welding processing technology
    * The information system (PLM&ERP) was launched, and the company management began to be based on the data platform

    2007

    * Duplex steel equipment exported to Japan;
    * Obtain SQL Design Certificate and ASME "U2" certificate
    * Jiangdu Construction Phase II put into operation: total production area of more than 13500M2; The lifting capacity of the workshop reaches 100 tons

    2006

    * High Pressure Gas Method (HPGSL) code design and production of towers and heat transfer equipment exported to Japan * ASME code design and production of large pressure vessels exported to the United States

    2005

    * Construction of high-level heat exchanger production line, adding CNC plasma cutting machine, CNC drilling machine, automatic tube and tube welding machine, CNC tube expansion machine and other advanced equipment

    2004

    * Established Jiangdu Junye Process Machinery Equipment Co., Ltd. and put into production that year, and successively passed and obtained ISO9000, SQL, ASME certification and certificate